Assets & tasks / PRODUCTION GUIDE
Does stopping a product batch cancel the item already generating?
Stopping a batch prevents its waiting items from starting. It does not cancel an item that already has a submitted generation job, delete completed results or prove a refund. Inspect the current job separately and let its recorded outcome guide what you keep, recover or plan next.
Separate queue control from the submitted operation
In a hypothetical Unified style studio mug batch, one blue-mug image has completed, a green-mug image is currently generating and a white-mug image remains waiting. The merchant decides the remaining creative direction is wrong. Stop remaining tasks is useful for preventing the white-mug request from starting. It should not be read as an instruction that recalls the already submitted green-mug operation from the provider.
Read the item list before stopping so you can describe what is actually underway. A batch waiting entry has not reached the same stage as a submitted job. Do not infer that a task is unstarted merely because its preview is empty. Check Generation tasks for the current job identity and recorded state, particularly if the browser was disconnected during submission.
Understand the effect on each kind of item
| Item before Stop | Expected batch effect | Follow-up |
|---|---|---|
| Waiting with no submitted job | Cancelled in the stopped queue | Include it in any later revised plan |
| Already generating | Job is not cancelled by this action | Inspect its independent task outcome |
| Succeeded | Existing result is retained | Review and download if useful |
| Pending or unknown submission | Outcome is not established by Stop | Resolve the original task state |
The current queue marks waiting entries cancelled and changes the batch to stopped. Items with existing jobs continue to reflect the job outcome when status is refreshed. In the mug example, the green-mug result can still arrive later. That result should receive an ordinary product review; stopping the queue does not automatically make it rejected, deleted or unavailable.
Fictional batch M4 is stopped because the green-mug placement now requires lid revision R2. Blue result B1 still matches the brief. Green job G1 was already submitted using the old R1 lid; white entry W1 is verified as not submitted. Stop cancels W1 in that queue, but G1 can still return an R1 result. Hold it for the R2 campaign even if generation succeeds. A stopped queue does not turn an outdated product into a valid asset.
If the reason was only that no further variants were needed, an accurate returned G1 may remain useful after review. The reason for stopping and the actual result decide its use. A blank preview alone does not prove an entry was never submitted; resolve a lost response through the original task records. This example establishes neither provider cancellation nor a refund, and no operation was run.
Use Stop when the remaining plan no longer makes sense
Choose this action when you want to prevent further items using the saved batch plan. A wrong product edition, unsuitable scene direction or changed campaign requirement can justify that choice. Keep a short explanation so another reviewer understands why the remaining entries were stopped. Do not stop merely to create a second overlapping batch when the original job is still unresolved.
A stopped batch is different from a paused batch awaiting valid continuation. The current Continue action applies to paused batches; it is not a general restart button for stopped work. If the remaining products need a revised plan, prepare a new batch after reviewing the original job and quote. Preserve useful completed results rather than treating the old batch as disposable history.
Check the applicable generation and failed-task terms separately from this queue decision.
Review the current job and credit record independently
Open the recorded generation for the green mug. If it succeeds, compare the actual product and decide whether that asset serves any valid placement. If it fails, read the shown outcome and credit records. If its submission remains uncertain, use the available original-task recovery path. Stopping the queue does not establish which of these outcomes occurred or whether the provider already incurred processing work.
Do not promise a refund for a submitted operation simply because the campaign changed. The batch action is a queue decision; billing follows the particular generation record and applicable account rules. A full planned batch quote is also not evidence that every waiting entry was already charged. Check actual records rather than multiplying cancelled entries by a remembered tutorial price.
Abandoning an uncertain job, where that action is available, is a separate decision with its own displayed consequence. Do not use the word stop to describe both operations without explaining the difference. Preserve the original task identifier for reconciliation and avoid creating a replacement solely because the stopped batch no longer advances.
Build the replacement set from accepted results
After the current mug job reaches a clear outcome, decide which campaign assets remain usable. The blue-mug image may still meet the brief, and the green-mug image may be acceptable even though the saved scene direction was discontinued. List only the missing or wrong deliverables in the new plan. This keeps the revised production scope tied to actual needs rather than recreating every old item for administrative neatness.
Use task-state investigation before replacing uncertain work. Consult variant-level approval when deciding which completed results remain approved. Keep the stopped batch, original job outcome and replacement plan distinguishable in your notes. None of those records should claim provider cancellation or payment reversal unless the actual operation and account evidence establish it.
Sources and further reading
Recorded source-review dates are listed individually below. An undated source does not inherit the article’s publication date. Software and platform rules can change; check the current original before acting.
- CartVisual: editorial scope and evidence policy · Review date not separately recorded
- CartVisual: current credits, expiry and failed-task terms · Reviewed
Frequently asked questions
Can the current image finish after I stop the batch?
Yes. Stop remaining tasks does not cancel a generation job already submitted; inspect that task separately.
Can I resume a stopped batch with Continue?
The current Continue action applies to paused batches. Plan revised remaining work separately after resolving existing jobs.
Does Stop automatically refund a running operation?
No refund is established by this queue action. Use the recorded job outcome and account credit records.
PREPARE ASSETS FOR YOUR NEXT STEP
Create supporting product assets in CartVisual.
Create new product creative assets in the workspace, then continue in your chosen tools. Third-party software procedures described in this guide take place in those applications; this workspace link does not imply an integration. Check current capabilities, account access and credit quotes.
Explore asset creation tools Check pricing and credits