Continuing a paused batch lets its remaining waiting items proceed; it does not automatically retry a failed item or recreate successful results. First inspect the interruption and the original task states. If a related job is still active, pending or uncertain, resolve that existing work before trying to continue the batch.

01 / WHAT DOES CONTINUING A PAUSED PRODUCT BATCH ACTUALLY DO?

Read the batch and item states separately

This guide concerns the Unified style studio product batch. Its queue and per-item jobs are separate records; it is not a description of complete TVC’s own recovery controls. In a hypothetical four-candle batch with one variant per product, the first image succeeds, the second fails and two items remain waiting. The paused label describes why the queue stopped advancing. It does not say that the first result disappeared or that the other two were already generated.

Open the item list and identify the interruption before pressing Continue. Keep the successful result, read the failed item message and check whether an uncertain task exists. Treat missing confirmation differently from a recorded failure. A browser interruption can leave an original task worth checking, so another click should not be used as a guess about whether the provider received the request.

02 / WHAT DOES CONTINUING A PAUSED PRODUCT BATCH ACTUALLY DO?

Establish what continuation will actually schedule

Item stateAfter a valid continuationSeparate decision still needed
SucceededExisting result remainsProduct approval and download
FailedNot automatically resubmittedWhether a corrected new request is worthwhile
WaitingEligible to proceed in the queueCurrent inputs, access and applicable quote
Active or uncertain original jobCan block continuationInspect and resolve the original task

For the candle example, valid continuation can move on to the third and fourth waiting products while the failed second item stays failed. The current queue does not reset every item to waiting. A batch can eventually reach its completed queue state with an unsuccessful item still recorded. Review the actual outputs before describing the campaign set as complete or approved.

Fictional batch Q4 has A1 succeeded, A2 failed and A3/A4 waiting. Suppose the team replaces A3’s source photo in the library after the pause. Continue still uses the source saved with this batch; changing a library entry does not rewrite that saved batch input. If A3 needs the corrected photo, stop the remaining work and prepare a new reviewed batch with it.

If only A2’s source is defective and A3/A4’s saved inputs remain valid, continuing can let those waiting items proceed after the checks pass. A2 is not reset and A1 is not recreated. An unknown A2 is not a confirmed failed A2: resolve the original job first. These are invented branches, not an actual library change or Continue test.

03 / WHAT DOES CONTINUING A PAUSED PRODUCT BATCH ACTUALLY DO?

Resolve an uncertain job rather than starting a duplicate

The current continuation check rejects related jobs that remain running, queued, submitting, downloading, pending or unknown. Look in Generation tasks for the recorded job and its available recovery action. Checking an existing task is different from requesting another candidate. Keep the recorded submission associated with the batch, especially when its outcome has not yet been confirmed.

If the task is definitely failed, decide what needs correction before considering another generation. An unusable source photograph or unsupported input needs a concrete change. Continue the remaining appropriate items only if their references and campaign assumptions are still valid. Do not interpret the Continue button as a repair tool for the failed product or as a promise that the same provider request will be submitted again.

The queue state does not supply a new quote, retry authorization or billing outcome for the original item.

04 / WHAT DOES CONTINUING A PAUSED PRODUCT BATCH ACTUALLY DO?

Review the remaining plan and the shown recovery message

A pause creates a useful checkpoint. In the candle batch, inspect whether the third and fourth jars use the same problematic reflective source setup as the failed item. If they do, advancing the queue may repeat the underlying issue. Stop the remaining work and prepare better inputs when the plan needs a material change. If only the second source is defective, continuing the other valid items can remain a reasonable choice.

Read the current quote and access information before submitting new work. If the workspace reports that credit prices changed and instructs you to stop and recreate the batch, follow that recovery path. Repeated Continue clicks do not refresh an incompatible saved quote. No fixed credit rate in a tutorial can replace the quote shown for your account and requested operation.

Review credit records separately from queue status. Successful and failed items have their own recorded outcomes, and continuation does not itself establish a refund. Keep an original result when one appears after status recovery. This prevents a newly planned replacement from duplicating a task that was merely awaiting confirmation.

05 / WHAT DOES CONTINUING A PAUSED PRODUCT BATCH ACTUALLY DO?

Create a separate repair plan for the skipped product

After the remaining queue reaches a clear outcome, list accepted products and missing deliverables. For the hypothetical campaign, the second candle may need one corrected request using a sharper label reference. Record that as a new production decision with its own quote, rather than calling it a continuation of the failed item. Avoid regenerating the three already approved images just to obtain a visually complete batch history.

Use original-task recovery for uncertain job states. The creative preflight checklist helps review the outputs that survived the interruption. Keep a handoff note identifying skipped items and the reason. Queue completion, successful generation and campaign approval are three different conclusions, each supported by its own visible evidence.

Published by CartVisualPublished Updated Evidence and editorial policy
SOURCES & SCOPE

Sources and further reading

Recorded source-review dates are listed individually below. An undated source does not inherit the article’s publication date. Software and platform rules can change; check the current original before acting.

QUESTIONS, ANSWERED

Frequently asked questions

Will Continue retry the failed image automatically?

No. It advances remaining waiting items after the continuation checks pass; the failed item is not reset for automatic retry.

Why is continuation blocked while a task is pending or unknown?

The original submission may still need resolution. Inspect its recorded task and available recovery action before starting more work.

Does a completed batch mean every item succeeded?

No. Inspect item outcomes and approved results. Queue completion does not certify a full usable creative set.

PREPARE ASSETS FOR YOUR NEXT STEP

Create supporting product assets in CartVisual.

Create new product creative assets in the workspace, then continue in your chosen tools. Third-party software procedures described in this guide take place in those applications; this workspace link does not imply an integration. Check current capabilities, account access and credit quotes.

Explore asset creation tools Check pricing and credits